As one of the long-term monitoring holes of shallow geothermal energy in Shanghai, 0T01, it was successfully put into operation in 2011. Sobo, as the construction party, actively cooperated with the Shanghai Geological Survey Institute to conduct long-term follow-up, and it has been put into operation for 5 years.
On-site groundbreaking
Take pictures around the temperature measurement well
As one of the long-term monitoring holes of shallow geothermal energy in Shanghai, 0T01, it was successfully put into operation in 2011. Sobo, as the construction party, actively cooperated with the Shanghai Geological Survey Institute to c